A Quick Update

The internet is back but the electricity is being switched off as soon as possible, so I need to keep this short and sweet.

Everything on the improvements is progressing well. The living room will be the first to be finished. It's been gutted, new electrics installed, plastered, and will be partially decorated on Monday and Tuesday. This will be the walls and ceiling, finished in white matt emulsion, after which the radiators can be reconnected and the second fix on the electric finished off. The skirting and door won't be done until the rest of the dirty work upstairs is finished.

They are now working upstairs on the ensuite, my bedroom and the family bathroom so that it is ready for the plasterer to return and skim those three ceilings. Then they'll install the ensuite and once I have a working shower and toilet, rip out the family bathroom. 

They're about a third of the way through the work and pretty much on schedule so all is good ... so far!


Comments

  1. Fingers crossed that the continuation goes slowly & quickly. It's an exciting time for you to see all this actually going from planning to doing. Let's hope the finishing is soon.

    ReplyDelete
  2. Glad to hear things are moving forwards.
    Arilx

    ReplyDelete
  3. Oh, my. Such a lot going on but it sounds as if they are making great progress and won't it be wonderful when it's all done and dusted. Really looking forward to photos.
    xx

    ReplyDelete

Post a Comment

Popular Posts